The Process – Goods Received
Materials are received into a secure compound, weighed, booked onto the computer system and given a unique individual identity number. This number enables the material to be tracked through the various stages of preparation and sampling, before it is released to production when it loses its identity.
Material is received in:-
20 tonne bulk containers
Bulk tipping articulated trailers
Bales
Drums
Bulk-bags
Boxes
Pallets
Pallet boxes
Plastic Kegs
Carbouys
IBCs
Customer specialised containers
Security
Security of customer’s materials and precious metals is paramount and JBR has the following measures in place:-
- Continuous (24/7) manned security presence.
- CCTV, card access and intruder alarms where precious metals are stored and handled.
- Security search and metal scanning procedures for all persons leaving the production site.
- High security vault, fitted with alarms, cameras, and smoke-cloak for the storage of high grade metallics.